Bid Levelling and Comparing Estimates
Bid Levelling and Comparing Estimates
Summary
Bid levelling lets you compare subcontractor quotes against your own internal numbers — line item by line item — so you can evaluate pricing before awarding.
This is the single place where you see your project estimate,estimate, your bid package estimate,estimate, and eachevery subcontractor’s submittedsubcontractor quote side-by-sideside.
Subcontractors only ever see their own quote and the bid package line itemsitems. (They never see your internal numbers).estimated values.
Prerequisites
When
- you
Youcreatehave an activea bidpackage with at least one trade that has received subcontractor quotes.Line items are recommended for detailed comparison (optional but highly valuable).
Steps
Open Bid Levelling for a specific trade— Frompackage, theproject →Bidding→ select your active bid package → click the desired trade (or open any subcontractor’s Bid Conversation and select theBid Levellingtab).
Review howline itemsare created and synced— Whenyoubuilt the bid package you added trades and line itemsadd in the Trades & Cost Breakdownstep. Those line itemsstep automaticallyappearflowininto your master project estimate (withas $0 values bydefaultdefault, orimportedwith your existing estimate values if youchoseimportto import)them). Subcontractorsfillthenoutpricethethose exact same lineitems,items.enablingIn
truebid levelling you are compared:- Your internal project estimate (or manually entered values)
- The bid package estimate (synced copy of your line items)
- Each subcontractor’s submitted quote (totals + line items + attachments)
The left column always shows your numbers. The right side stacks every subcontractor who bid on that trade.
Prerequisites
- An active bid package that has received at least one subcontractor quote
- (Recommended) Line items created in the bid package for detailed apples-to-apples
comparison.comparison
Steps
-
Access Bid Levelling — From your project → click Bidding in the left menu → select the active bid package → click any trade with quotes, OR open a subcontractor’s Bid Conversation and select the Bid Levelling tab.

-
Understand how line items sync between estimate and bid levelling — Line items created in the bid package automatically appear in your project estimate. If you imported values from your estimate when creating the package, those numbers stay perfectly synced — update in one place and they update in both.

-
Compare your estimate
vsagainst subcontractor quote(s) — The left sideshowsis locked to your internal numbers andtotal (synced from the project estimate if imported).total. The right side showseacheverysubcontractor’ssubcontractor who submitted for that trade, stacked vertically with their line-itempricingpricing, totals, andtotal.anyMultipleattachedsubcontractors who bid on the same trade appear stacked for instant visual comparison.files.
-
Evaluate
differencesvariances, allow revisions, andpreparecomparetomultipleawardbidders — Scrolland compareline-by-linevariances,tototals,spotand any attached documents.differences. Subcontractors can resubmit anytimebyusingremovingRemoveandQuoteresubmitting→theirnewquote.submission. All bidders on the same trade appear together in the fixed layout (no filters needed). The view works identically on mobile(layoutwithadjustsresponsiveautomatically).adjustments.
Confirmation
You are
nowin the Bid Levellingview withview: your internal estimate on the left, subcontractor quote(s) stacked on the right,and allline items and totals clearlydisplayedvisible for direct comparison.FAQ
Can subcontractors see my internal estimate values?
No.NoSubcontractors— they only see the bid package line items and their own submittednumbers.pricing.What if I didn’t
createadd line itemsinto the bid package?
Subcontractorswillcan only submit a lump-sumtotal andtotal; youwillloseonlyline-itembevisibilitylimited to total-priceand comparison.Can a subcontractor
update orrevise their quote after submission?
Yes — theycan selectclick Remove Quote in their bid conversation andresubmitsubmit a new one as many times as needed.Do
changes I makeupdates to my project estimate automatically update in bid levelling?
Yes, if you imported the line items when creating the bidpackage,package; the valuesstayremain synced in both places.How are multiple
bidssubcontractors displayed for the sametrade displayed?trade?
Allbidsquotes appear stackedside-by-sidevertically in the same fixed layoutsoforeveryconsistentquoteside-by-side comparison.What happens to the bid conversation after I award the bid?
The conversation stays open. Communication simply moves to Project Job Chat or Action chats.Does bid levelling work on mobile?
Yes — the layout adjusts for smaller screens but all functionality isevaluated consistently.identical.Related Articles